The Platform

The H.A.T. Agenda

Honest Protection · Action on Affordability · Transparency at City Hall. Three commitments, built from conversations in every quadrant of District 1 — and honest about what a council seat can and cannot do.

Platform pillars
3
Quadrants organized
4
Election Day
November 3, 2026
Three pillars

H · A · T — built from the ground up

Each pillar carries four specific initiatives. Select "Show initiatives" on any pillar to see the full detail.

The H.A.T. Agenda · Pillar H

Honest Protection for Seniors, Families & Neighborhoods

Fighting the fraud epidemic hitting our seniors hardest. California lost $1.4 billion to elder fraud in 2025 alone — up 68% from the year before, and the worst total of any state in the country.

$200M

AARP's BankSafe-trained tellers have helped stop an estimated $200 million in attempted financial exploitation nationally — with trained staff intervening roughly 12× more often than untrained staff.

Source: AARP / Virginia Tech pilot study

The H.A.T. Agenda · Pillar A

Action on Affordability

Closing loopholes, cutting hidden costs, restoring assistance. Roughly two-thirds of District 1 households rent, and the average District 1 household earns about $46,400 a year — every dollar of hidden cost matters.

$500K

Proposed affordability pilot: a Utility Gap Fund ($175K), Housing Stability Fund ($125K), tenant & legal navigation services ($85K), outreach and enrollment ($45K), and enforcement/data tracking ($45K) — every dollar itemized and reported quarterly.

Source: William Perez campaign platform

The H.A.T. Agenda · Pillar T

Transparency & Accountable City Hall

Open books, plain language, real oversight. Residents shouldn't need a law degree to understand how the city spends their money. Accountability starts with information residents can actually use.

The stakes

Why this matters in District 1 right now

The numbers behind the platform — cited statistics, not talking points.

3.7% / 8.7%

Annual rent increase allowance

For buildings with 5+ units versus 4 or fewer — a loophole that leaves tenants in smaller buildings exposed.

Source: City of Inglewood

~2/3

District 1 households are renters

Living side by side with longtime homeowner families — stability matters for everyone.

Source: Campaign analysis

$1.4B

Lost to elder fraud in California, 2025

Up 68% from the year before, and the highest total of any state in the country.

Source: FBI IC3 2025 Annual Report

$46.4K

Average District 1 household income

Versus roughly $61,000 countywide — every hidden cost hits harder here.

Source: Campaign analysis

"This is not homeowners versus renters. District 1 succeeds when our neighborhoods are stable for everyone."

— William Perez, candidate for Inglewood City Council, District 1
Event Traffic

Moving Fans, Protecting Neighbors

A H.A.T. Plan for Event Traffic in Inglewood District 1

William Perez | October 2026

Overview

The Bottom Line

Manage event traffic from SoFi, Intuit Dome, the Forum and YouTube Theater as one system. Move fans to transit, keep cars on major corridors, close neighborhoods to cut-through traffic, and publish the results.

H

Honest Protection: keep event traffic off residential streets

A

Action on Affordability: venues pay their share, not residents

T

Transparency & Accountability: measure and publish every event

Context

What Is Already Coming

  • $261M Transit Connector Phase 1, funded by State of California and Metro grants
  • Event-day shuttle lanes north and south, with bus-priority signals
  • Three parking and transit hubs with 1,000+ stalls, plus a pedestrian bridge over Florence to the K Line
  • Streetscape work starts November 2026; bus lanes and signals in 2027
  • The elevated people mover is paused for lack of funding
  • The gap: rules, enforcement and public reporting. District 1 should own this part.

Sources: Urbanize LA, ENR, LA Conservancy (Sept–Oct 2026)

H — Honest Protection

  • Local-access-only zones on event days, with staffed checkpoints
  • Emergency routes to Centinela Hospital and fire stations kept clear
  • Free parking permits for seniors and caregivers; guest permits by phone
  • Litter and noise cleanup within 12 hours of each event

A — Action on Affordability

  • Venues share event costs: enforcement, shuttles, cleanup
  • Relief fund and access guarantees for Market Street businesses during construction
  • Inglewood residents first in line for traffic and shuttle jobs
  • Free or discounted shuttle days for residents

T — Transparency & Accountability

  • Publish baseline traffic data before bus lanes open in 2027
  • Scorecard within 72 hours of every event over 15,000 people
  • Shared calendar for all four venues, start times 90+ minutes apart
  • Quarterly District 1 traffic town halls; annual independent review
Comparison

Comparison: Cost, Timeline, Agencies

MeasureEst. CostTimelineLeadPartnersImpact
Event bus lanes + signalsWithin $261M ITC2027Public WorksMetro, Elevate InglewoodHigh
Hubs + Florence bridgeWithin $261M ITCNov 2026–2028City / Elevate InglewoodMetro, StateHigh
Remote parking + shuttlesEst. $25K–$75K/eventNowParking & TrafficVenues, MetroHigh
Local-access zonesEst. $8K–$20K/eventQ1 2027 pilotInglewood PDPublic WorksHigh
Emergency corridorsLowQ1 2027 pilotFire DeptPD, CentinelaHigh
Permit upgradesEst. $50K–$150K once6–9 monthsParking & TrafficCity ITMedium
Venue cost-shareBrings in money2027City Manager / CouncilSoFi, Intuit Dome, ForumMed–High
Business relief fundEst. $250K–$500KBefore Nov 2026Economic DevelopmentChamber, ElevateMedium
Rideshare zonesLow3–6 monthsParking & TrafficUber, LyftMedium
Event stagger ruleLow6 monthsCity ManagerAll four venuesMed–High
Baseline + scorecardEst. $40K–$100K/yrQ1 2027Public WorksPD, venuesMedium
Freeway ramp coordinationCaltrans-fundedOngoingCaltrans D7City traffic centerMedium
Elevated people moverVery high; unfundedAfter 2028City / MetroState, federalHighest

"Est." figures are planning estimates to confirm with city staff.

Roadmap

Timeline

  1. Oct–Dec 2026

    Prepare

    Business relief, resident alerts, data request

  2. Jan–Mar 2027

    First 90 days

    Baseline, pilots, venue talks

  3. Spring–Summer 2027

    Budget

    Fund it in FY 2027–28

  4. 2027–2028

    Build

    Bus lanes, hubs, Olympic test

  5. After 2028

    Review

    Independent review

Accountability

How We Will Measure Success

MeasureTarget
Time to clear traffic after events25% faster than baseline
Fans arriving by transit or shuttleHigher every year
Resident complaints per event30% fewer
Emergency response on event daysNo slower than normal days
Scorecards posted on time100% within 72 hours

Targets will be adjusted once the city provides baseline data.

For residents

For Residents: What You Can Do Today

  • Get your parking permit. Call Parking & Traffic at (310) 412-5398
  • Register guest permits before event days
  • Report blocked driveways right away
  • Plan errands around event start times

Construction on Market, Manchester and Queen starts in November 2026.

Updates: inglewoodtransitconnector.com/updates

Shop local on Market Street during construction.

Your Street. Your Neighborhood. Event Days Done Right.

Join the District 1 Traffic Town Hall

William Perez for Inglewood City Council, District 1

Contact the campaign
Have a priority we missed?

The best priorities come straight from the neighborhood.

Share what you would put at the top of the list.

Contact the campaign